
Manufacturing
- Pharma, Medical Equipment, Plastics, Chemicals, etc
- Environmental Consulting
- Audits
- Environmental Impact Statements or Assessments
- Environmental Site Assessment - Phase I & Phase II
- Waste Management & Remediation
- Value Offers
- Pollution Prevention Plans
- Permits
- Monitoring & Sampling
- Occupational Health & Safety Programs and Training
Pharma, Medical Equipment, Plastics, Chemical, Printing, Electrical, Cement, Food, Textiles, etc.
Environmental & occupational one stop service for manufacturing industries.
Feel assured of total compliance with regulations & standards requirements relevant to your operations.
Get expert counsel & an outside point of view on compliance requirements & needs for a complete range of environmental, health & safety (EH&S) issues.
Performance is creative & adaptive, offering personalized solutions & follow-up in a cost-effective way.
Follow-up and negotiate after work submittal for prompt implementation conformance and approval of requirements by regulators, at no additional costs.
We cover all environmental realms: Air, Water, Soil and Waste.
• Audits
• Permits
• Plans
• Monitoring
• Sampling
• Assessments
Verify your compliance, obtain required permits, endorsements & approvals, prepare your Plans.
Call us for a complimentary personal consultation over the phone or an office or plant visit for a compliance verification.
An Audit is a detailed & systematic oriented approach to evaluate specific regulatory, industry standards & permit requirements for accuracy & completeness. Such as monitoring, sampling, record maintenance, procedures & practices.
Are you planning on a new site or expansion for your manufacturing plant?
A Categorical Exclusions, Environmental Assessment (or Form) and/or an Environmental Impact Statement may be needed.
These is how government agencies resort to for planning and decision making, for actions that can have a significant impact on the quality of the environment.
Is a necessary requirement when submitting a permit application for a construction activity or any other action that may represents a potential impact to the environment.
In other cases some specific actions which are routine and predictable by nature and whose impact upon the environment are known to be insignificant will be treated as a Categorical Exclusion.
Call us for a complimentary consultation on your specific needs.
Are you planning on acquiring a new plant or a property for a plant site?
Determine if theres a potential that involved parties could be exposed to any environmental liability with a Phase I Environmental Site Assessment.
This satisfies one element of the innocent purchaser defense under CERCLA Federal Law.
Phase II ESA´s - intended to evaluate recognized potential environmental conditions identify by the Phase I ESA
The nature & extent of the possible contamination.
These Assessments assist you in making informed business decision about the property.
Our insider experience provides valuable knowledge on inner workings of regulatory agencies.
Experience evaluating development endorsement applications & environmental documents.
Get a definitive edge with someone knowledgeable in regulatory agency intricacies.
Regulatory know how - favorable relationship - ease & expedite your compliance process.
Also, insider in - government infrastructure agencies - Designing, planning & management.
See details follow this link: Value Offers
No additional costs follow-up on adequate implementation and agency negotiation for approval.
Complimentary EH&S Compliance Verification. See More
On demand-on call - EH&S specialist for your compliance needs. See More
See a complete description of our added value and complimentary offers. Click the Links
Prevent, control & prepare to respond adequately to avoid contaminants to reach surface waters. The Storm Water Pollution Prevention Plan - SWPPP applies to 10 categories of industrial activity were runoff can come in contact with exposed material handling and storage activities and; pick up pollutants and transport them to nearby surface waters.
The Spill Prevention Control and Countermeasure Plan - SPCC, may apply to you:
• If you store oil &/or its derivatives & other regulated liquids in above ground tanks or
other containers.
Prevent oil spills from occurring, be prepare to take action to control oil spill, and avoid it to reach the water. The SPCC (Emergency Plan under EQB) requirements depend on the quantity of liquids stored.
Reduction & Recycling Plans – reduce, reuse & recycle.
All Plans may include training on industry and site specific best management practice (BMP’s).
We perform Air Emissions Construction & Operation Permits, Title V & compliance monitoring.
Water related permits include the NPDES Effluent Permit, the Industrial Stormwater Permit, and the Underground Injection.
The Waste Oil, is our waste related permit.
Preparation, submittal & follow up, until conformance & approval.
Monitor & sample your emission & discharge points.
Occupational Safety & Health services for your particular activity:
• Management
• Programs
• Training
I prepare specific safety & health programs for your occupational issues.
We are OSHA authorized Health and Safety trainers for 10 & 30 hours for General Industry
The training courses include a completion employee card.
Verify your compliance, obtain required training, prepare your programs, get assistant with management.
Call us for a complimentary personal consultation over the phone or an office or plant visit for compliance verification.
Carolina, PR 00984
+1 787 726 6455